Ordered the final pieces (I hope) to make the well pump setup essentially a permanent installation, they should be here tomorrow, the stainless braided hose and fittings probably won't be done until Wednesday, once that is completed, then I can put things back together. I am sure there are other leaks I will find under the house, but the plan was always to rip out existing and start over. I will have to tap into the existing cold water lines and water heater for a while, going to get a replacement water heater and redo the plumbing as I move the sinks and bathroom around.
As for the office, I have things scheduled with actual contractors that will show up, so I expect to see a lot of movement on that front during the month of September, would be awesome to get the office moved in before snow flies.
I am over at the SG gathering up things for tomorrow, not 100% sure what the direction will be, but I need to get the gate figured out for the tower site. This is where I am pushing to meet expectations, I also am ready for deviations, and I have alternative plans set too, no curve ball is going to keep me from being productive (famous last words!).