C2 Turbo
Well-known member
Tile: Marble 18x18
Space: 1/8th
The first tile guys brother got diagnosed with a cancer so he left without any notice
Hired another guy to finish installing the marble and the medallion that was custom cut by the first tiler.
During the install, the tile work looked good until I saw the final product that showed lots of issues like, lippage, inconsistent spacing, broken/chipped tiles etc
Once medallion was installed, I wasn't happy with it's finish either, to which he agreed and said he would do it again without any mention of extra charge.
The following 2 days, he spent taking those medallion pieces off (already set in) and adjusting them not to mention making the new ones as he kept breaking them up.
Few days ago, I had another tile guy come over and looked at his work and I was told it was a lousy job he was doing
I finally told the current to pack his stuff and move on, which seems to have pissed him off.
He now gave me an invoice for the amount originally quoted for the work along with 2 extra days spent trying fixing the medallion tiles, which he kept
breaking them off.
So I now have a foyer with no medallion and with badly installed tiles (Pict 5) which he thinks is acceptable considering he's coming after another guy.
My question is:
How do I pay him? He did install the medallion and the tiles but with big gaps, broken tips, butted tiles etc .
He himself volunteered to redo the medallion and after 2 days he still wasn't getting any where with it?
He doesn't see anything wrong with the tiles so I don't want him to continue working on the project
The new tile guy would have to re-do the entire foyer along with the medallion.
Please review the pictures of his work yourself
Picture 4 shows a small piece which is not even aligned right .
Thanks
Space: 1/8th
The first tile guys brother got diagnosed with a cancer so he left without any notice
Hired another guy to finish installing the marble and the medallion that was custom cut by the first tiler.
During the install, the tile work looked good until I saw the final product that showed lots of issues like, lippage, inconsistent spacing, broken/chipped tiles etc
Once medallion was installed, I wasn't happy with it's finish either, to which he agreed and said he would do it again without any mention of extra charge.
The following 2 days, he spent taking those medallion pieces off (already set in) and adjusting them not to mention making the new ones as he kept breaking them up.
Few days ago, I had another tile guy come over and looked at his work and I was told it was a lousy job he was doing
I finally told the current to pack his stuff and move on, which seems to have pissed him off.
He now gave me an invoice for the amount originally quoted for the work along with 2 extra days spent trying fixing the medallion tiles, which he kept
breaking them off.
So I now have a foyer with no medallion and with badly installed tiles (Pict 5) which he thinks is acceptable considering he's coming after another guy.
My question is:
How do I pay him? He did install the medallion and the tiles but with big gaps, broken tips, butted tiles etc .
He himself volunteered to redo the medallion and after 2 days he still wasn't getting any where with it?
He doesn't see anything wrong with the tiles so I don't want him to continue working on the project
The new tile guy would have to re-do the entire foyer along with the medallion.
Please review the pictures of his work yourself
Picture 4 shows a small piece which is not even aligned right .
Thanks
Attachments
Last edited: