AND START POSTING. We finally got our new house and garage build underway after delays buying the land and waiting out one of the nastiest winters on record here :mad: Site guy came today and started work. Here's the required pics. These were taken on Friday:

Temporary Service
newhouse1.jpg

Shot of the land
newhouse2.jpg

More of the land
newhouse3.jpg

Yet more of the land
newhouse4.jpg

The old garage foundation, this thing was TINY!
newhouse5.jpg

The old basement entrance and well location. This well is scheduled to be abandoned.
newhouse6.jpg

The site guy's excavator has arrived!
newhouse7.jpg

Clearing a big tree
newhouse8.jpg

More of the big tree
newhouse9.jpg


Let's see some comments!
 
Last edited:
To avoid these ads, REGISTER NOW!
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Today's progress pics:

Site guy starts stripping topsoil
newhouse10.jpg

The well driller shows up and parks his truck on site
newhouse11.jpg

More of the site guy working
newhouse12.jpg


newhouse13.jpg


When I went over there late this afternoon he had most of the topsoil stripped. Tomorrow he's supposed to grade and the well driller is supposed to begin drilling.
 
Last edited:
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Beautiful Area. Looks like a great place to live.

It sure is going to be a nice spot when done and it's really going to revitalize the neighborhood. The house that was there belonged to an old guy that lived in it with a big hole in the roof and the house just about falling apart. He then moved out and sold the land to the guy that we bought it from who had the old house and garage torn down and was going to build a new house on it in 2005. Unfortunately for him the big D word came and then the economy went bad and he is a house builder. The house never got built and the property was left abandoned. After some big title issues got worked out we got over there in November and started clearing the land. I do not have pics of what it looked like when we got in there but it was like the Amazon jungle. All overgrown and the next door neighbor had cut down 4 trees and let them fall into the old yard (previous owner gave her the OK to do so). We had to cut up those 4 trees and clear the land so contractors could even get in there and do work. Then we had 2 more trees to cut up and remove after that
 

tinbender 66

Well-known member
Joined
Mar 23, 2011
Messages
2,294
Location
Western Washington State
That looks like a nice piece of ground. I don't know how much property you have but it looks like enough. I've got a couple acres and I could never go back. Keep us posted. Hope that guy hits water before he hits China!
 

Kevin54

MEMBER EMERITUS
Joined
Jan 12, 2005
Messages
29,341
Location
Urbana, Ohio
Looking forward to the progress pics. Make sure you keep all of us updated so we don't have to hunt you down!!!!
 

Pneuking

Active member
Joined
Feb 12, 2011
Messages
39
Personally I can't wait to see more. This looks like a cool neighborhood with some hills. What style architecture are you going with?
 

DEV0

Active member
Joined
Aug 20, 2008
Messages
36
Location
Phoenix, AZ
It's nice to see builds in such lush areas.

I sometimes wish we had real seasons here in the desert.
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Personally I can't wait to see more. This looks like a cool neighborhood with some hills. What style architecture are you going with?

Single floor ranch house, built to full ADA codes (wheelchair user here).
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Another progress update:

The well driller came out today and started drilling the new well. He hit rock ledge at 28 feet (this is good). It means we won't have to use a ton of casing pipe (saves money). The site guy was not there today but he HAS to be out there tomorrow because we have the foundation contractor scheduled to start forming footings on Friday. This also means that the CL&P monkeys need to get out there and do final hook up on the temp service in the first pic. I will be talking to the clearing desk tomorrow and finding out when they are coming out there to get me live.
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Another progress update:

The well driller came out today and started drilling the new well. He hit rock ledge at 28 feet (this is good). It means we won't have to use a ton of casing pipe (saves money). The site guy was not there today but he HAS to be out there tomorrow because we have the foundation contractor scheduled to start forming footings on Friday. This also means that the CL&P monkeys need to get out there and do final hook up on the temp service in the first pic. I will be talking to the clearing desk tomorrow and finding out when they are coming out there to get me live.

Well, we just had our first screw up on this build. I talked to the CL&P monkeys today and they want their hookup fee. I was told I'd get billed for this AFTER the service was hooked up. NOPE. I called the foundation contractor and told her to have a generator ready :mad:
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Major progress! Well is at 75 feet and drilling, forms are being poured today and the site guy is still at it. Pics soon :)
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Re: More pics

Went over to the site tonight and got some more progress pictures:

Footings formed and poured:
newhouse14.jpg

More footings:
newhouse15.jpg

The well driller was still at work:
newhouse16.jpg

More well driller:
newhouse17.jpg

A general site shot:
newhouse18.jpg

That old garage foundation is GONE!:
newhouse19.jpg

Well driller video:
 
Last edited:

slimpickins

Well-known member
Joined
Mar 27, 2011
Messages
2,404
Location
Canada
Re: More pics

Went over to the site tonight and got some more progress pictures:

Footings formed and poured:
newhouse14.jpg

That's an odd shaped footing! Have you got a plan drawing, as I can imagine what this is going to look like, except I'm already interested to see what's going on top of that footing!!!
 
To avoid these ads, REGISTER NOW!

bluesman2a

Well-known member
Joined
Aug 16, 2005
Messages
1,312
Location
Atlanta, Ga.
Re: More pics

That's an odd shaped footing! Have you got a plan drawing, as I can imagine what this is going to look like, except I'm already interested to see what's going on top of that footing!!!

If I read that correctly, I think that's just around the well-house where they drilled maybe?
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Re: More pics

That's an odd shaped footing! Have you got a plan drawing, as I can imagine what this is going to look like, except I'm already interested to see what's going on top of that footing!!!

That's not to get around the old well, that's the actual shape of the foundation. I would post the drawings however they are too big to scan :(
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
After a big weather delay the walls are poured and forms are stripped. Pics coming :)
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Got the foundation walls poured, inside walls insulated and the drainage system installed:

newhouse20.jpg


newhouse21.jpg


newhouse22.jpg


newhouse23.jpg


newhouse24.jpg


The well is done at a depth of 220 feet and 15 GPM. This coming week we do underground rough in and some more site work in prep for the slab pour. It's moving along :)
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Re: More pics

Time to update the thread with some more pics finally!

Utility conduits are going in
newhouse25.jpg


newhouse26.jpg

The large pipe on the bottom is the well conduit
newhouse27.jpg


newhouse28.jpg

Getting ready to pour the slab!
newhouse29.jpg


newhouse30.jpg


newhouse31.jpg


newhouse32.jpg


The slab is now poured. I don't have any pics of this yet because of the lousy weather here this weekend. The framer is scheduled to start on Thursday (YES!). A tip for you guys in CT, if any of you need a GOOD sparky I got the man to call. Jon Breda from Pro Electric. He mostly does commercial jobs but is work is top notch. If you want his number shoot me a PM.
 
Last edited:

ConCretin

Well-known member
Joined
Jan 20, 2011
Messages
3,378
Location
Central Maine
Very nice looking foundation. Looks like they even rubbed the top foot or so (?). You don't see that much anymore. Thanks for posting.
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Very nice looking foundation. Looks like they even rubbed the top foot or so (?). You don't see that much anymore. Thanks for posting.

WE ground down the top foot. I have a 7" 5/8-11 grinder and Dad works in construction and picked up the wheels for free :)
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Nice touch.

Thanks, We got the wheels because some idiot was running then on a 10,000 RPM grinder when they were only rated for 7,500 and one of them blew up in a guy's face. Next week Dad had a little talk with the guys on grinder safety :)
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Got the tops of the foundation walls rubbed, framer starts on Monday :)
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
The roof trusses are now up! Tomorrow they should start sheeting the roof!

newhouse39.jpg


newhouse40.jpg


newhouse41.jpg


newhouse42.jpg


newhouse43.jpg


newhouse44.jpg


newhouse45.jpg


newhouse46.jpg
 
OP
R

ratman2

Well-known member
Joined
Nov 23, 2008
Messages
74
Some sheeting is now on the roof. Not as much got done as I thought would get done due to manpower issues. The roof felt and shingles are now on site as well.

newhouse47.jpg


newhouse48.jpg


newhouse49.jpg


newhouse50.jpg


newhouse51.jpg


newhouse52.jpg


newhouse53.jpg
 