rockwithjason
Well-known member
i got a project today to install a new feeder to a building. the job requires me to run some 3 inch rigid conduit so i set up the greenlee 884 and went to work. i needed to fab up a 9 inch offset using 15 degree bends. about 45 minutes from set up to complete bends.

