After my wife and I started our recent home improvements, my garage was the final phase. Here are some pics of the whats gone on so far.
The garage is 24x28 with a play room upstairs and on the main floor you will notice, my 6'x8' safe room. My contractor crew worked 2 days on filling the walls with 3500#'s of concrete and rebar. The vault it's self is made up of 2 exterior walls and the 2 interior walls sit on 12" concrete footings.
Hoping to have this done within 20 days.
I can't wait to hear what the inspector has to say about the Vault.
Right now I'm waiting for another 5 days until the Truss arrive.
The garage is 24x28 with a play room upstairs and on the main floor you will notice, my 6'x8' safe room. My contractor crew worked 2 days on filling the walls with 3500#'s of concrete and rebar. The vault it's self is made up of 2 exterior walls and the 2 interior walls sit on 12" concrete footings.
Hoping to have this done within 20 days.
I can't wait to hear what the inspector has to say about the Vault.
Right now I'm waiting for another 5 days until the Truss arrive.