I just had a 40x36 post building erected. Concrete is not poured yet. I am stubbing in Conduit and other utilities. I would like to dig around the inside of the perimeter to lay 2-3" of foam board for insulation.
The base layer is about 8-12 inches of VERY dense, rocky material. They had compacted it down with a large machine in prep for the concrete. I just dug a hole by hand to stub in conduit for electric. It was back breaking work with a pickaxe and misc. shovels. It took me about an hour to dig a 1 foot wide, 2 foot deep hole from inside to outside. I cannot image digging 18" down around the entire perimeter so I can slot in the foam board.
Does anyone have tools suggestion or methods that might make this easier? I feel that I may need to abandon the idea :-(
The base layer is about 8-12 inches of VERY dense, rocky material. They had compacted it down with a large machine in prep for the concrete. I just dug a hole by hand to stub in conduit for electric. It was back breaking work with a pickaxe and misc. shovels. It took me about an hour to dig a 1 foot wide, 2 foot deep hole from inside to outside. I cannot image digging 18" down around the entire perimeter so I can slot in the foam board.
Does anyone have tools suggestion or methods that might make this easier? I feel that I may need to abandon the idea :-(