I spent a whole lot of time on the lights. The just seemed to take awhile, plus I really didn't like being that high on the scaffold. I had a friends come over and help a little which was a life saver because there were times I had had enough up there with both hands over my head lifting a light fixture and/or holding a drill or wrench. I figured the most secure way was to mount to the ceiling. So, I made a pattern off the existing bolts where the building panels were bolted together, drilled holes in the fixtures and double nutted them to the existing bolts. The lights consist of 8' fixtures with 2 pair of tandem 4' bulbs. I put 3 of these end to end from the front to the back, which get me right to the loft area. There are a total of 4 rows of across the building. The circuits will be the 4 across the building on 3 separate switches, so front, middle and back. I used flex conduit as a raceway to put the Romex through, because it looked better and once I ever insulate and something goes wrong I can repull wire if I have to. The flex conduit worked really well with the curvature of the building. You'll see, I got the first set up and wired. I put a plug on the end and plugged them into my extension cord, then I had light!! wohoo!!
Truck