misterfixit
Well-known member
Starting on the new shop, have an electrical question. First let me say that I'm out in the country and there are no inspections, which really only means there are no inspectors to ask how they want it. I am the only one who has to be satisfied with how it is done. I only say that not because I intend to cut corners, but because I am the final authority on this by default.
I have 325 amp transformer from utility company. Service goes underground to my meter base which has dual lugs. One set of lugs feeds the breaker panel for my house. The second set of lugs now goes to a 200 amp disconnect about 2 feet from the meter. From that disconnect I will take 4/0, 4/0, 2/0 URD to my new building breaker panel. I know that it needs to be 18" underground minimum, and that from 18" up has to be in conduit. I also know that URD is made to be direct burial.
My question is this: what are the pros and cons of placing the entire run in conduit? about 130 feet will be in the ground.
I have 325 amp transformer from utility company. Service goes underground to my meter base which has dual lugs. One set of lugs feeds the breaker panel for my house. The second set of lugs now goes to a 200 amp disconnect about 2 feet from the meter. From that disconnect I will take 4/0, 4/0, 2/0 URD to my new building breaker panel. I know that it needs to be 18" underground minimum, and that from 18" up has to be in conduit. I also know that URD is made to be direct burial.
My question is this: what are the pros and cons of placing the entire run in conduit? about 130 feet will be in the ground.