Thanks again, hopefully this weekend I will get all the supplies and get that underlayment down ready to be tiled. 2/04/2015
You have to say I am an optimist

I actually put the last floor tile down about a month ago. Having to deal with a floor that had a couple of high spots (1/2"+)took way more time then I imagined. I actually put down another layer in the low spots of 1/4" CBU just so I didn't go through so much mortar.
I was putting about 5lbs/mortar on a single tile, just to set it level, so half a bag was doing about 5~6 tiles at a time. Put down the mortar, back butter the tile, set the tile, not level. Pull it back up, repeat a couple of times adding more material until I got it set and level. Move on to the next one. It was taking more than 20 minutes a tile that way. filling up the low spots with CBU really sped up the operation.
In retrospect, I really should have paid somebody to put down some SLC. I was afraid of doing that myself as the consequences of getting it wrong would have really caused me some grief. First major kitchen remodel for me and probably the last. I would have to pay myself about $30K just to break even on the time involved. Now that the floor is more or less done (still have to do the hallway and bathroom) putting in the new wall and floor cabinets is the next issue.
Have the wall cabinets up, that was a real treat. Set the corner ones in first and continued out. I set them right up against the ceiling to give maximum distance between the lower and upper cabinets as the ceiling is low in the kitchen (84”). Turns out the ceiling goes one way on the X axis and a different way on the Y axis. So I had to trim the tops of the adjoining cabinets to match the ceiling so all the bottoms matched. Good thing I’m not getting paid for this job, I would be living in a dumpster right now.
I see now the obvious way is to use a ledger board, and leave a 1”+ gap at the top to account for the ceiling, fill that in with some sort of molding. Finding a stud in a plaster/lath wall was another fun time. Tried the fancy stud finder from HD and it was right about 50% of the time. Otherwise it was the drill a series of holes until I found a stud, then go 16” and see if there’s another one. Plaster walls kill drill bits/diamond grit jig saw blades/etc. The only thing that really works well is the diamond blade for the angle grinder and using it throws dust like a sand dune dragster. Since I’m putting in all new floor cabinets, the power outlets are in the wrong place, so they have to be moved up. Had to add a couple of outlets also, took about 75ft of BX cable and more holes in the wall.
Once I get that done, and figure out exactly where to place the base cabinets, plumbing the dishwasher will be the next piece of the puzzle. Also I need to put a backsplash behind the stove and refrigerator since the wall will be visible behind them. Between the counter top and bottom of the cabinets will need to be tiled too. Hopefully that goes better than the floor did. It’s like building a puzzle, you have to put the pieces in order. At this rate I should be done by new years eve. Thanks to Bryan (Duneslider) for his answers to my never ending questions.