Finally into a 5,000 sq ft shop vs my old 900 and I wanted a nice welding table. I had a stainless kitchen prep table in the past and I am sure glad to have an upgrade!!
Before I could start I needed a steel rack. Had a simple up right rack I made for the old shop that sat along a wall. Don't have as many open walls now with tool boxes, benches, and tools so I needed a cart on casters.
Once that was done, cut out and assembled the base:
My floor guys said the floor coating was weld proof... They lied, burned up the new floor.
Added in a grinder rack along one side
Add 120 power boxes to the opposite corners so I can leave grinders plugged in and have extra outlets when needed.
Same thing with air
Next up are a bunch of ******* receivers for quick attachment mounts around the table
Had to flatten the table side
Gig and mounts got welded on. Made some nifty T bolts to add tension
Casters and floor on.
Flipping it
Done with the tool box mounted under for welding and grinding supplies
Before I could start I needed a steel rack. Had a simple up right rack I made for the old shop that sat along a wall. Don't have as many open walls now with tool boxes, benches, and tools so I needed a cart on casters.
Once that was done, cut out and assembled the base:
My floor guys said the floor coating was weld proof... They lied, burned up the new floor.
Added in a grinder rack along one side
Add 120 power boxes to the opposite corners so I can leave grinders plugged in and have extra outlets when needed.
Same thing with air
Next up are a bunch of ******* receivers for quick attachment mounts around the table
Had to flatten the table side
Gig and mounts got welded on. Made some nifty T bolts to add tension
Casters and floor on.
Flipping it
Done with the tool box mounted under for welding and grinding supplies