Kevin54
MEMBER EMERITUS
I just called the contractor that has been blowing me off for the last four months. He said that he has been waiting on the concrete company to give him a price, as their prices are only good for 30 days, and according to a letter he received, the price is going to go up 15%. I told him I don't care about the 15% as it will only add $300+ to the bill.
Now he wants me to buy the materials, and he will do the labor and price it for labor, but he has a material list.
So I think I'm going out of town to my regular concrete guy. I gave him a call, and waiting on him to get back with me. I can tell him the size and thickness over the phone, and he can have me a price tomorrow. And if I have to buy the materials, I may as well build my own walls, then find someone to set them. One thing about our county, no one wants to work, but you mention beer supplied.......
I was seriously trying to avoid doing anything, but it looks like I will be on the phone and doing a shitload of legwork.
Now he wants me to buy the materials, and he will do the labor and price it for labor, but he has a material list.
So I think I'm going out of town to my regular concrete guy. I gave him a call, and waiting on him to get back with me. I can tell him the size and thickness over the phone, and he can have me a price tomorrow. And if I have to buy the materials, I may as well build my own walls, then find someone to set them. One thing about our county, no one wants to work, but you mention beer supplied.......

I was seriously trying to avoid doing anything, but it looks like I will be on the phone and doing a shitload of legwork.



