Quickerthanu
New member
- Joined
- Sep 27, 2013
- Messages
- 3
Just got some concrete steps poured and me being the perfectionist...saw this at the bottom step. Looks like when they were pouring it may have gotten some water on it.
Anyway to remove that prior to be sealing the concrete? (acid etch possibly)
On the sealing note....am I out of time now that our temps are no longer above 70 and get down into the mid 30's?
Thanks all!!
Anyway to remove that prior to be sealing the concrete? (acid etch possibly)
On the sealing note....am I out of time now that our temps are no longer above 70 and get down into the mid 30's?
Thanks all!!



