Like the title says, if you had to rebuild what would you do next time that you didn't this time.
Last time I built I had to reuse the old slab, next time it gets a new slab with 2 foam underneath, more power than I have now and a small heat/ac unit in the wall. 12 foot walls and a lift
Last time I built I had to reuse the old slab, next time it gets a new slab with 2 foam underneath, more power than I have now and a small heat/ac unit in the wall. 12 foot walls and a lift



