Wiebster
Well-known member
Hello, I’ve read through the sticky’s and I don’t believe this applies, and I’m sorry if I missed it. I’m building a new shop, the power company would only run their power 250’ so the meter is 75’ from my shop. I have the 3” conduit ran from the meter to the outside of the shop. I buried a ground rod in the trench for the power company to ground the meter to. What do i need to complete this run to my shop 200 amp panel? I thought 4/0-4/0-2/0 URD. I have a UFER footing ground in my slab. So I thought the two hots to their lugs, neutral to its lug and then my UFER ground to the ground bar. Does this sound correct? The four wire requirement discussed in the sticky has me second guessing myself. Thanks guys.