Hello all,
Newbie here, learning a lot.
Just finished building my 30x32 garage here in SE Pennslyvania. I hired an electrician to run a sub-panel out to the garage and wire outlets to the garage door openers.
I decided to save some $ and finish the electrical myself.
So now for the question. What distance (from the CB panel) should I drill holes for running romex to my light switches?
It is close to the circuit breaker panel so I figured instead of running the wire all the way up the stud and back down I could just drill left to the switches.
Here's a picture of what I'm trying to say.
Thanks for all your help and ideas
Newbie here, learning a lot.
Just finished building my 30x32 garage here in SE Pennslyvania. I hired an electrician to run a sub-panel out to the garage and wire outlets to the garage door openers.
I decided to save some $ and finish the electrical myself.
So now for the question. What distance (from the CB panel) should I drill holes for running romex to my light switches?
It is close to the circuit breaker panel so I figured instead of running the wire all the way up the stud and back down I could just drill left to the switches.
Here's a picture of what I'm trying to say.
Thanks for all your help and ideas