This will be my first time to wire a building, so bear with me -
When I have my electrical outlets and lighting planned, should I go ahead and mount the boxes where I want them, then run my wire?
I have not even moved my power over yet, but trying to figure out what I can do until then
(meanwhile waiting on concrete to cure to put the floor coating on)
When I have my electrical outlets and lighting planned, should I go ahead and mount the boxes where I want them, then run my wire?
I have not even moved my power over yet, but trying to figure out what I can do until then
(meanwhile waiting on concrete to cure to put the floor coating on)