Well-known member
A question for you builders.
So I'm working on the final back part of my "U" snapped 30x40 mezzanine. The 2x6 joists are only 61" long between the double 11" deep LVLs and double 2x10s. There's going to be 3/4" tongue and groove plywood over it. On my side 7½ wide decks I blocked in the middle but would you do it for the smaller deck?



So I'm working on the final back part of my "U" snapped 30x40 mezzanine. The 2x6 joists are only 61" long between the double 11" deep LVLs and double 2x10s. There's going to be 3/4" tongue and groove plywood over it. On my side 7½ wide decks I blocked in the middle but would you do it for the smaller deck?