Long time listener, first time caller in this sub-forum of GJ.
Coming to you live from Eastern Iowa (Cedar Rapids).
We moved into a new (2 year old) house October 2023 and there was 1 larger unfinished storage room in the basement with good space and high ceilings. There's also an unfinished HVAC/Water Heater utility room on the opposite wall I'm also working on finishing up for some extra storage, etc.
Anyway, here's the progress so far.
-Installed 3 more lights
-Installed outlets as there was a grand total of 1 in there before.
-Mapped out home network/future server rack
-Mapped out Bike Steady Rack placement, wire management, etc
-Installed Rockwool Safe N Sound insulation on the main wall shared with the basement TV area/HVAC/Water heater room.
-54"x12 Drywall Ordered/Hung/Taped/Almost finished
Future things to do:
-Figure out a ceiling situation. Perhaps paint black, maybe higher drop ceiling with a little soffit for the HVAC/Pex access, not a priority.
-Figure out the flooring situation. Maybe polished concrete, vinyl plank to match the rest of the upstairs, rubber mat for future gym, there are many options.
Overall, it's a great start for some bicycle tinkering, workout space, and 3D printing workspace.
PICS!
Had to remove the railing to get the big sheets of drywall down the stairs.

Before with helper (Marley, she's about to turn 2!)

Before with a few work stand mounting options



Sound Insulation


Whole home Ethernet/Coax/Fire/Security layout for future rack or at least easier cable management.

Hanging
Coming to you live from Eastern Iowa (Cedar Rapids).
We moved into a new (2 year old) house October 2023 and there was 1 larger unfinished storage room in the basement with good space and high ceilings. There's also an unfinished HVAC/Water Heater utility room on the opposite wall I'm also working on finishing up for some extra storage, etc.
Anyway, here's the progress so far.
-Installed 3 more lights
-Installed outlets as there was a grand total of 1 in there before.
-Mapped out home network/future server rack
-Mapped out Bike Steady Rack placement, wire management, etc
-Installed Rockwool Safe N Sound insulation on the main wall shared with the basement TV area/HVAC/Water heater room.
-54"x12 Drywall Ordered/Hung/Taped/Almost finished
Future things to do:
-Figure out a ceiling situation. Perhaps paint black, maybe higher drop ceiling with a little soffit for the HVAC/Pex access, not a priority.
-Figure out the flooring situation. Maybe polished concrete, vinyl plank to match the rest of the upstairs, rubber mat for future gym, there are many options.
Overall, it's a great start for some bicycle tinkering, workout space, and 3D printing workspace.
PICS!
Had to remove the railing to get the big sheets of drywall down the stairs.

Before with helper (Marley, she's about to turn 2!)

Before with a few work stand mounting options



Sound Insulation


Whole home Ethernet/Coax/Fire/Security layout for future rack or at least easier cable management.

Hanging