I need some advice. After I discovered that my floor was different thicknesses (ranging from 3" to 3.75") I cut and poured 2 3'x3'x12" pads for the posts. It'll be obvious why I'm mentioning this.
Prior to even ordering the lift I had purchased 3 of the PD58 anchors from Drillspot and installed one in another location to see if my floor would accept them. This was before I discovered that my floor varied in thickness. These 3 anchors ended up being different from the ones I received with the lift. These 3 had what I'd call barbs sticking off the sleeve, which I assume help the sleeve expand as the anchor is being pulled up. The anchors I received with the lift just had small bumps on the sleeve. I believe this is why I am having issues.
I had problems with 3 of the anchors pulling up when I torqued the bolts with the lift (after the setting procedure). I was successful in getting 2 of the anchors to grab by simply pushing them farther down in the hole and purchasing longer bolts. The final anchor will just not set. Here's is where the pad depth comes into play. I cannot just push the anchor through because I couldn't find a 12" drill bit, I could only find an 8" one.
I have attempted to pull the anchor up using a block of wood with a hole it, but I'm just compressing the wood. Right now it sits about 1/2" out of the hole. The way I see it I have two options: cut off what is above the floor and bang it down as far as possible and purchase another PD58 hoping it is the version with the barbs, or move the posts. If I move the posts I'd have to drill another 8 holes and purchase 8 anchors (and they would be epoxy). I'd really rather not do this.
Are there any other options I'm not thinking of?
Prior to even ordering the lift I had purchased 3 of the PD58 anchors from Drillspot and installed one in another location to see if my floor would accept them. This was before I discovered that my floor varied in thickness. These 3 anchors ended up being different from the ones I received with the lift. These 3 had what I'd call barbs sticking off the sleeve, which I assume help the sleeve expand as the anchor is being pulled up. The anchors I received with the lift just had small bumps on the sleeve. I believe this is why I am having issues.
I had problems with 3 of the anchors pulling up when I torqued the bolts with the lift (after the setting procedure). I was successful in getting 2 of the anchors to grab by simply pushing them farther down in the hole and purchasing longer bolts. The final anchor will just not set. Here's is where the pad depth comes into play. I cannot just push the anchor through because I couldn't find a 12" drill bit, I could only find an 8" one.
I have attempted to pull the anchor up using a block of wood with a hole it, but I'm just compressing the wood. Right now it sits about 1/2" out of the hole. The way I see it I have two options: cut off what is above the floor and bang it down as far as possible and purchase another PD58 hoping it is the version with the barbs, or move the posts. If I move the posts I'd have to drill another 8 holes and purchase 8 anchors (and they would be epoxy). I'd really rather not do this.
Are there any other options I'm not thinking of?
