Well-known member
We refer to our home as Larsonville and all since all good towns "need" a City Hall, that is the name of my shop (It probably makes more sense if you know I was the former Mayor of an actual city).
I'm building a 40'x60'x15' Mueller Bolt-Up Building.
It's basically going to be a big hobby shop with a bathroom that will double as a bath/changing room for the future pool.
I've been working with a plumber trying to determine if there's enough fall to the septic system to keep us from raising the foundation or adding a grind pump. It was close and he suggested we install the septic line first to make sure. So installing the septic line was the official start of my shop build.
There's some plumbing going on in that hole (main house septic line with the shop line tee'd in, sprinkler pipe and wire, air line for septic system and electrical conduit for septic system).
And we're done!!
And the good news is... there is enough fall!!
Foundation starts tomorrow!!
I'm building a 40'x60'x15' Mueller Bolt-Up Building.
I've been working with a plumber trying to determine if there's enough fall to the septic system to keep us from raising the foundation or adding a grind pump. It was close and he suggested we install the septic line first to make sure. So installing the septic line was the official start of my shop build.
There's some plumbing going on in that hole (main house septic line with the shop line tee'd in, sprinkler pipe and wire, air line for septic system and electrical conduit for septic system).
And we're done!!
And the good news is... there is enough fall!!
Foundation starts tomorrow!!