Need some knowledge from you guys that have finished off the inside of a metal building. I have a 30x50x16 uninsulated blank canvas. Ryan’s atomic headquarters has finished off the interior of a metal building and what I’m interested is what worked and what did not when filling in-between the horizontal girths to support eight feet of plywood down and eight feet of drywall up.
I’m looking for pictures of how you framed between the girths and dealt with the red steel vertical beams. I do not want to lose seven inches by studding in front of the girths. I do have one section with diagonal cables which I will need to deal in so if you show how you handled that it would help as well.
The girths are at 5, 10, and 15 on the side walls and box in a 12x14 and 8x7 roll up doors a double set of man doors and three windows. Will I need to run 16” centers or will 24” do? How about do I need horizontal blocking at 4, 8 and 12 to end the plywood and drywall on?
I have seen once a few years ago where someone used metal studs and flattened the faces where it crossed the girths. Only time I have ever seen that approach used.
When filling in the wall what is the best way to attach it? Should I bolt plates above and below each girth and toenail a stud between them? I really would like to see pictures how you framed around the red metal, and when butting it worked vs. boxing it fully.
Any tricks on using some sort of trim/materials would be greatly appreciated. I would like to tap into the wealth of knowledge from this community so that I can begin from a greater knowledge perspective.
As all GF threads pictures will be greatly appreciated, tips on wiring hiding air lines and tricks insulating what worked and even what to stay away(did not work) from will be gratefully accepted.
Thanks,
I’m looking for pictures of how you framed between the girths and dealt with the red steel vertical beams. I do not want to lose seven inches by studding in front of the girths. I do have one section with diagonal cables which I will need to deal in so if you show how you handled that it would help as well.
The girths are at 5, 10, and 15 on the side walls and box in a 12x14 and 8x7 roll up doors a double set of man doors and three windows. Will I need to run 16” centers or will 24” do? How about do I need horizontal blocking at 4, 8 and 12 to end the plywood and drywall on?
I have seen once a few years ago where someone used metal studs and flattened the faces where it crossed the girths. Only time I have ever seen that approach used.
When filling in the wall what is the best way to attach it? Should I bolt plates above and below each girth and toenail a stud between them? I really would like to see pictures how you framed around the red metal, and when butting it worked vs. boxing it fully.
Any tricks on using some sort of trim/materials would be greatly appreciated. I would like to tap into the wealth of knowledge from this community so that I can begin from a greater knowledge perspective.
As all GF threads pictures will be greatly appreciated, tips on wiring hiding air lines and tricks insulating what worked and even what to stay away(did not work) from will be gratefully accepted.
Thanks,