Quick update - they put insulation throughout the house - and on the heated walls in the garage.
We paid for the garage walls to be insulated - I bought it up with the builder so that should get put in before the drywall goes up. The drywall should go up next week - then onto the flooring and making it look like a house!
After I move in - its my turn to start building:
- Install lighting in the garage
- Install the lift (Drill holes for the MaxJax)
- Install the tv mount and hang all of the cabinets
- Do something about the floor in the garage
Then I got car projects:
C6: Install the E-Force blower, replacing the timing chain gasket up front, get it retuned.
SS: Install Corsa catback.
So much stuff to do!