Hi my name is Kyle. I'm a heavy duty diesel mechanic for the transit agency here in Whatcom county, WA state. I just had a 36x36 shop built at my place and I went ahead and put a Bend Pak XPR 10A in it. The middle bay of my shop has 8 inch thick 6 sack concrete. Anyway I set the whole thing up and after using it a few times I decided I wanted to adjust the right post a little bit. I took the anchors loose and when I went to tighten them back down they started pulling out. I got 4 out of 6 to actually make the wrench click but they're farther out of the concrete than I would like. 2 of them actually pulled out. The concrete actually cracked out from one of the holes as you can see in the picture. My poor brand new floor
. Anyway, I have 2 questions. I think the empty holes are going to get longer anchors with epoxy, I should of went and got longer anchors instead I used 3/4 x 5 1/2 red heads. The lift came with 5 inch anchors no name on them. The other 4 holes have maybe 3.5 inches of anchor in them. Is this enough? Should I keep tightening the nut and pull them out all the way and do the same for them? Thanks for the advice in advance. Here's some pictures.
Last edited:



