After a 2.5hr work period of cutting measuring, finding tools, soldering, and testing I finally got the water line sorted out that went from the house to the garage.
I replaced the old shut off valve that was here with a new quarter turn ball valve.

Outside I made the connection to the pex line and also raised the spigot to make it more comfortable to work with and put a new spigot.

And look at that! Water coming out of the spigot on the garage!

I had to shut the house water off since I needed to install a toilet shut off valve, so figured I would get this checked off my list of things to do. Just need to get some masonry sealant to seal the hole where I passed the pvc conduit through the cinder block wall for the copper pipe to pass through.
I replaced the old shut off valve that was here with a new quarter turn ball valve.

Outside I made the connection to the pex line and also raised the spigot to make it more comfortable to work with and put a new spigot.

And look at that! Water coming out of the spigot on the garage!

I had to shut the house water off since I needed to install a toilet shut off valve, so figured I would get this checked off my list of things to do. Just need to get some masonry sealant to seal the hole where I passed the pvc conduit through the cinder block wall for the copper pipe to pass through.