My driveway is 600' long. I used dirt as a bed, and built it up close 12" thick. Since time was on my side, I let it sit for over 6 months. When I got the money, I ordered 12 loads of crushed concrete on a Friday. The drivers tailboarded each load for me, and I spread it with my tractor &...