Last week, I helped a friend epoxy his 800 sq ft shop. We ground and cleaned plenty, and did the rest of the prep work needed.
I tried to talk him into doing a primer, but he did not, as the manager at the local SW talked him out of it. Even on the spec sheet, it says no primer needed.
He...