D45
The cost was $2600 for all of the labor hauling away the dirt,concrete,and bringing the gravel and mixing the new concrete. and the large Basins, I provided the PVC and pumps and power.
They did the job in 9 hours. which was great as we did not want this dragging out...
I'm sure others...