Dmitch,
I am doing a similar set up. Done so far is the 42x75 barn, concrete, well, roughed in drainage and electric. Up next, if it ever stops raining here, is septic. Then I'll finish one end (15x42) for bath, bedroom, kitchen and living area as you are planning.
For heat I am thinking...