    Excavation Contractor finished the loam work and graveled the drive. The builder starts on Monday. Should go pretty fast now I hope.
  4. F

    What do you see when you look out from your garage?

    Here is a pic of tonight looking out where the walk in door to my shop is.
  5. F

    Farmall-IH Workshop

    Looking forward to seeing your build... Need some pics of the 806 and the cub!!!
  6. F

    Farmall-IH Workshop

    Back filled yesterday, received almost 6 inches of rain in 24 hours...really helped the compaction.. also shown is the floor insulation and the frost posts for the shed overhang.
  7. F

    Farmall-IH Workshop

    So I think I made a pretty good score today. I picked up 6 bolt bin cabinets for $120... They are not perfect, but with some cleaning and TLC and some IH red paint, I think they will come out all right.
  8. F

    Farmall-IH Workshop

    Foundation crew came back this morning and had the whole thing stripped, cleaned up and loaded in an hour. It looks awesome. This weeks agenda: get it backfilled and compacted, lay the vapor barrier and insulation for the floor, and get the floor poured.
  9. F

    Farmall-IH Workshop

    So the walls are poured and they will be stripped in the morning. Cant wait to see how they look
  10. F

    Farmall-IH Workshop

    Pouring the walls today. Last night we had a little ceremony and blessed the building and put a small symbol of our faith in the Northeast corner to forever guard it.
  11. F

    Farmall-IH Workshop

    The footings are 5 ft down....I'm real happy with how its going so far.
  12. F

    Farmall-IH Workshop

    forms for the footings in and poured
  13. F

    Farmall-IH Workshop

    Digging for the footings today...will be formed and poured this afternoon
  14. F

    Farmall-IH Workshop

    So the fill is in place.. It took 800 yards of fill to get it leveled out. Putting the water to it, keep compacting it for a week. Foundation to be put in the week of the 21st.
  15. F

    Farmall-IH Workshop

    The narrow front is a Farmall 504, gas. The first tractor is a 460 Hi-Clear utility also gas and is one of 266 built. The middle pic is a Farmall 100, its predecessor was the Super A.
  16. F

    Farmall-IH Workshop

    Pics of where they are at tonight... Lots of fill!!!
  17. F

    Farmall-IH Workshop

    A few pics this morning to show where the grade is going to end up. The pink ribbons on the first two stakes are the grade, the last stake there is no ribbon because the grade is above it. Going to take a lot of fill and compaction.
  18. F

    Farmall-IH Workshop

    Thank you, it will be nice to get them undercover and get the shop organized
  19. F

    Farmall-IH Workshop

    Some of my "iron" pictures
  20. F

    Farmall-IH Workshop

    Some more pics from the end of day.
Top Bottom