  1. G

    Framing a load bearing wall on post frame slab

    6" slab will support your load no problem.
  2. G

    please criticize my floor plan!

    Is the rebar for strength or crack control?
  3. G

    What to Expect from Civil Engineer?

    Most engineers do what it takes to do it right, not what it takes to get a permit. Some things are over kill, some things can come back and karma your wazoo.
  4. G

    Balcony?

    As with any structure, its seems a good plan until its overloaded. Hanging things from trusses is sketchy. If you hang things, pay attention to your connections.
  5. G

    Hanging storage from steel building trusses

    The truss will hold it, but only if the design load and SF are not exceeded. Most times the bottom chord is not designed for the load unless you ask, but obviously has some capacity.
  6. G

    Educate me on garage slabs, please

    A slab is only as good as the sub base. Spend the time on that, and you can go with no reinforcement.
  7. G

    How to find and qualify a structural engineer?

    Basically you have a cantilevered retaining wall that needs designed. If all other plans are done, I would charge around $600 for the design and a couple of sketches. Not sure what an engineer in Nashville would charge, but if over $1000, find another one. Are you going to step the wall up...
  8. G

    Drafter vs Architect?

    In Ohio, an Architect can stamp drawings, with or without an engineers review. They are 'trained' on structural design too. Now, most do have a engineer review, but they still stamp. At least some for residential.
  9. G

    Rebar for garage footing and foundation.

    Im seeing 1-#4. What version/year you using?
  10. G

    Buying a lot of lumber

    Steel studs also have a load bearing capacity.
  11. G

    Thrift store donation, scrap weight, other ideas for old tools??

    use craigslist or facebook marketplace, offer them for a few bucks or free.
  12. G

    Gantry Crane I-beam sizing

    I just ran a 2 min calc. Its not a huge span or load. So many options.
  13. G

    Anyone familiar with steel building framing techniques?

    All builders are different. Mine they did expansion anchors. The concrete was at 75% of strength, it was 3 days later.
  14. G

    Footings yesterday, block today?

    Depends on the mix. We used to pour precast in the afternoon, and get 3000-4000 by morning. Also, the block is not that heavy compared to final load. Walk over and ask what psi they used
  15. G

    2-post lift without a slab?

    Get with an engineer and they could design the blocks based on the strength of the anchors, i.e. if they are only good for X, it doenst matter if you have X+Y footing, anchor is the weak link. Or call them and ask for the overturning moment, and design for that.
  16. G

    Gantry Crane I-beam sizing

    Quick calc looks like any W4 or W6 passes the test.
  17. G

    Structural advise needed

    80' length. I would suspect that 20-25' would be max for a LVL based on his location. Would have to run the numbers.
  18. G

    Tool box

    im happy with the box I got from Costco. Goes on sale too every once and a while.
  19. G

    Structural advise needed

    I Would say that a new ridge beam to support the load. Simple design for an engineer, also might need new footings each end.
  20. G

    Mezzanine time

    When in doubt, make it stout!!