Steel building requires a much different foundation than a standard stick built foundation.
Last steel building I did, the engineer spec'd 16'x16' pier footings 36" deep (24" frost line), 2 mats of #5 bar tied 6" o.c. 3" off soil and 6" above that for the 2nd mat, 4 uprights tied from the...