    It wasn’t initially. I had to cut it away in order to fit the panel where I wanted it. When they did the block the conduit pipe came up a couple of degrees off.
  2. G

    Project Begins

    Mounted the new sub panel and all of the outlet/fixture boxes. Started running the cables to the overhead lights and called it a day.
  3. G

    Project Begins

    Love the E30s, stumbled into the 2002 first
  4. G

    Project Begins

    Inspector signed off on filling the trench. Now I have a weekend project.
  5. G

    Project Begins

    Good progress being made. Guys had to stop short today because winds picked up too much to be working that high. I’ve also scheduled a (pre) rough in inspection of the electrical. Hopefully the inspector will sign off on me back filling the trench so that I can keep it from constantly filling...
  6. G

    Project Begins

    Framing has started
  7. G

    Project Begins

    Slab is poured
  8. G

    Project Begins

    Footing got poured today
  9. G

    Discovering plywood below grade

    House is brand new on a lot that was farm land. Seeing as how it is still pretty intact I’m guessing it was from construction
  10. G

    Well here’s a new issue...

    AC guy came out - supply and return lines were crossed during installation
  11. G

    Discovering plywood below grade

    Working on digging the trench and came across what looks plywood buried below grade at about 15”. The utility company came out and marked everything and nothing should be in this area. I’ve got septic, but that is on the other side of the house. Any ideas? Gonna call the builder in the morning.
  12. G

    Project Begins

    Update shots:
  13. G

    Project Begins

    Just met with another electrician who does after hours side work. He gave me a full run down of everything I need to look out for, purchase, and prepare for with the inspections. Also agreed to coming out, verifying everything is up to code and such for a very agreeable price.
  14. G

    Pay the man, or...

    Well alrighty. What should I run in conduit then?
  15. G

    Project Begins

    Also posted in a separate electrical thread but figured I’d post here too: Have a few questions for the group, since searching doesn’t return much: Because the price of 3-3-3-5 CU is absurd, I’m going with 2-2-2-4 AL. I had an electrician tell me to get SEU, but everything else I’ve read says...
  16. G

    Project Begins

    Hard to do via tapatalk without the app crashing. Next time I actually use a computer I’ll do that.
  17. G

    Pay the man, or...

    Call is in to the POCO - awaiting a call back. Have a few questions for the group, since searching doesn’t return much: Because the price of 3-3-3-5 CU is absurd, I’m going with 2-2-2-4 AL. I had an electrician tell me to get SEU, but everything else I’ve read says get SER. Which do I need...
  18. G

    Well here’s a new issue...

    Even turning off the upper zone it still happens. My money is on crossed lines.