When I was sketching up my addition, a engineer buddy of mine looked over my drawings and made the following recommendations - 5/8ths j-bolts, osb sheeting outside, spray foam, simpson flat strapping in x-braces, osb interior and then sheetrock over that. Nailing schedule was 4" with #10's. I...