I have about a 3400sf garage, built with ICF walls, 12' ceiling and wood truss roof system. Unfinished, roughing in electrical and plumbing now.
I don't use a lot of air, but want to plumb the air lines in the walls and ceiling before we finish walls and ceiling. I want it ready for the future...