Search results

  1. M

    Weekend projects...

    6" diamondplate baseboard and storm shield threshold for the new garage: Should keep me out of trouble...somewhat.:bounce:
  2. M

    Anyone ever deal with Texas Garages?

    www.texasgarages.com I just ordered some baseboard diamond-plate moulding for the garage,they had the best pricing and free shipping. Just seeing if anyone's done business with them.:headscrat
  3. M

    Garage is done...well almost!

    Never really done are they...but getting there! Was installed last summer,finally got around to trimming out the inside and started the picture/banner hanging process.Still undecided if I'll install floor tiles yet or re-seal the floor with a grey finish,here we go from start to finish,building...
  4. M

    New sign on outside of building...check it out!

    Cannot be seen from the street so no worries there...
  5. M

    Today @ 12:30PM...a dream was realized!

    They're all home now...!:bowdown: I like this shot best... Thinking about adding this 42" round enameled metal sign that I mocked up in this picture...it would be quite that large but almost...it'll fill that whole space. Wifey gave me the OK...what do you guys think?
  6. M

    My steel building has been delivered and assembled...!

    26'x24' steel building was delivered on Monday and after a little confusion on the overall height,construction resumed until Tuesday afternoon with this being the finished product at this point.I ordered the optional vertical front panel and somehow that part of the order got left off when the...
  7. M

    Thompson's water seal or Bahr or....?

    Trying to just seal a fresh concrete slab that has been curing for 30 days so far.I will put RaceDeck tile over the top,I just want to seal against staining & dusting. What would be the better product to use based on personal experience? I just want to go clear,no epoxy to worry about...this is...
  8. M

    Need advice on floor sealer/covering

    My slab is curing as we speak,the 13th of this month will be 30 days since poured. I'm having a metal building delivered and erected and I would prefer to seal my slab before the building comes. Please give me some advice guys on the following if possible...all replies would be greatly...
  9. M

    Garage newbie here from Nor Cal...

    Almost completing my 26x24x9 freestanding garage in my backyard for two more of my cars...bringing 'em all home.:thumbup: I had pavers installed on my sidewalk and drive past one side of my home and bordering the garage. Slab was poured last Saturday and the forms were removed on Monday when...
  10. M

    Hey Guys...newbie here w/questions about my freshly poured slab?

    Been a lurker here for awhile,finally got my project wrapping up and I had a question about how long to water my slab which was poured on Sat. morning. I let it sit overnight then we constructed a moat around it and it's been soaking since Sun morning. Concrete guy says if I could keep it...
Top Bottom