  1. S

    When to pull tape after Sikaflex in control joints

    I'm in the process of filling my expansion joints with Sikaflex. I taped the edges with 2" tape prior. I've used a putty knife to get the Sikaflex flush. Im curious as to how long I should wait before pulling up the tape? Thanks....
  2. S

    Sikaflex in saw cut control joints

    I want to start out by saying I have been a lurker on this site for some time and have learned a great deal from others experiences. An absolute treasure trove of information. I am in the process of building a 4000 sq. ft. metal building. The building has been erected and just a few days ago...
  3. S

    Test

    Just a test of slab Sent from my SM-G930V using The Garage Journal mobile app
  4. S

    Alternate light fixture

    I am in the process of building a 100' x 40' x 12' eave height building with a 2 on 12 roof pitch. It will be fully insulated with a white vapor barrier on both the ceiling and walls. The concrete will be painted in a very light gray. This building will be used as a personal machine shop. I...
  5. S

    Running conduit in insulated metal building

    I am in the early stages of having a metal building built. It is going to be insulated with a banding system that will provide 12" of insulation on the roof sections and 6" of insulation on the wall sections. The banded system will be finished with a vapor barrier on the inside of the building...