Search results

  1. S

    Stair and office framing inside Morton building

    Making s l o w progress on my Morton Building. The framing is finished for the office, mini-kitchen, and bathroom. Electrical is being completed now. When I ordered the building I added two options (among others). I increased the roof pitch to 6/12 and had one truss deleted so I could use space...
  2. S

    Woodstove install in Morton Building

    In post #40 here: https://www.garagejournal.com/forum/showthread.php?t=359404&highlight=Morton&page=2 I posted some pictures of my flue install in a Morton Building with 6.5 pitch roof. I have insurance and they are aware of the woodstove. It will be used to heat the two bays/shop area...
  3. S

    Morton 30 x 40 office garage build

    Thought I'd share some pics of my garage build. It is to the point of basic electrical service and am now waiting for finish grading and gravel etc. Approx. 12 x 30 on one end of the building will be an office, a with shower and toilet, and a kitchenette with sink, small gas range and small...
  4. S

    Morton Building

    Hi All, I think I'll share the process I've gone through with Morton. I continue to be impressed with Morton, which for me with contractors etc is no small thing. If my opinion changes I will let you all know. So I ordered the building in August. Had several sit downs with Morton at my...
  5. S

    North Central NC

    Hi all, I am having a 30 x 40 Morton garage built (start date end of Nov). Been learning here by reading without posting. Excellent forum. Thanks. Selo
Top Bottom