What do you think about these quotes for both materials and labor.
$10,500
Labor (includes everything except concrete, drywall, wiring, insulation):
$14,***
Materials (includes everything except concrete, drywall, wiring, insulation)
Here is a link to a copy of the plans (in PDF)...