Yesterday was very productive. A buddy from work came by and helped me get a load of supplies from Home Depot, then we brought everything upstairs. Drywall, cement board, compound, and a few odds and ends.
First step was to fix the leaking T at the cold water supply. Then I squared up the cut of the sink drain line and soldered on a trap adapter.
I added the backer boards where the drywall meets the cement board and installed a 6 mil vapor barrier.
The first sheet of drywall for the ceiling was exactly a 4x8 area and needed a square hole for the exhaust fan. That was the hardest sheet to put up because of the weight and the rest went in easily.
I skipped lunch and had to stop with 1 sheet to go at dinner time.
I’ll get that last sheet up this morning (there is one other small sheet needed in the wall of the closet but that will wait until the shower valve is installed).
After the valve and closet drywall is up, then I am mostly at a standstill until the shower pan arrives. I can’t install any cement board in the shower or on the floor without it. That gives my wife and I time to pick a vanity and tile and get them in order. The last vanity took about 4 weeks to come in. I need a 22”x36” unit and prefer a custom one rather than stock.
The house is a mess with tools everywhere. So a big part of today will be getting everything down to the garage and putting it away.
Most of these tools are no longer needed, or won’t be needed until much later.