Progress has been lacking lately.
I've been very busy at work, lots of overtime, which doesn't leave much spare time...
Today i sanded the first bit of (awful) flushing.
Then did the first coat, and tape joins i had missed last time, plus a second coat over the ones i'd sanded.
Not sure i've ever known a more efficient way of making a mess!
My skills are improving, i've gone from 'absolutely woeful' to 'average'...haha

as you can see in the background, the rest of the shed is an absolute pig sty!
I have been side-tracked by a little project for a friend.
He's fitting a toyota sc12 supercharger to a VW mk1 golf, just for a bit for fun really... so i offered to make some custom pipework for him.
This is something i really want to get into doing, but i need practice! he's guinea pig #1, and i have another friend lined up ready to be #2...
No welding yet, did some cutting and test fitting, a little bit of fettling required then i can tack it all together before another test fit, then if all is ok i can weld it up.
these pics are of one side, i've got a similar arrangement on the other side of the supercharger too.
