I do some from my pc and some phone so it's easy to do new posts vs continuing random thoughts. Pic 3 is the shut off and drip leg. If I was doing this again would change the design just a little but its irrelevant to its purpose.
The shut off is just below the little shim board inline. The other valve is an obsolesced piece I don't need line connected anymore. You can see the muffler clamp I put on as a bottle gard for the filter. I would have made another turn overhead and dropped right on it but the pipe I found worked out as it was at the moment. Right after I did it realized there was a little easier way. Was a design and build moment.
Also in pic 2 can see the qd goes to the hose reel which could actually be plumbed pre regulator, not needed in normal use,,, but connector goes to the reel and another T added a valve and connector to plug plasma in.
I normally use as few as possible but they are not losses in this. The reel or plasma can be disconnected for service. The plasma was being funny and had a small leak, I was busy,, said, **** will screw a valve to it. Was an easy fix.
Busy little spot, couple argon hoses, air, a stick weld lead, something else I forget.