Hi all, I have been getting some estimates for a driveway rip out and expansion - will end up being about 2300 sq ft going to a garage in the back of my property. I am considering an estimate from one contractor who has proposed to do: 6 inches of crushed stone, followed by 4 inches of 9.5 asphalt. He said he would try to lay the 4 inches of 9.5 in one go. He has definitely been the most cost competitive.
Some of the other estimates I received were noting: 6 inches of modified stone, 2 inches of base (25mm BCBC), followed by 2 inches of topcoat (9.5mm).
Is the base coat necessary? Should I be concerned with only using 4 inches of the 9.5 on top of the crushed stone? Would you have any concerns about laying the 4 inches in one pass?
I am located in southeastern PA if helpful. Thank you so much.
Some of the other estimates I received were noting: 6 inches of modified stone, 2 inches of base (25mm BCBC), followed by 2 inches of topcoat (9.5mm).
Is the base coat necessary? Should I be concerned with only using 4 inches of the 9.5 on top of the crushed stone? Would you have any concerns about laying the 4 inches in one pass?
I am located in southeastern PA if helpful. Thank you so much.