Hi all, I have been getting some estimates for a driveway rip out and expansion - will end up being about 2300 sq ft going to a garage in the back of my property. I am considering an estimate from one contractor who has proposed to do: 6 inches of crushed stone, followed by 4 inches of 9.5 asphalt. He said he would try to lay the 4 inches of 9.5 in one go. He has definitely been the most cost competitive.

Some of the other estimates I received were noting: 6 inches of modified stone, 2 inches of base (25mm BCBC), followed by 2 inches of topcoat (9.5mm).

Is the base coat necessary? Should I be concerned with only using 4 inches of the 9.5 on top of the crushed stone? Would you have any concerns about laying the 4 inches in one pass?

I am located in southeastern PA if helpful. Thank you so much.
 
To avoid these ads, REGISTER NOW!

mm08822

Well-known member
Joined
Jan 13, 2012
Messages
6,004
Location
NJ
I owned a house where i put in an asphalt drive in '91. It was 2" base + top coat. It was smooth as glass and to this day still looks great....no cracks.

The base coat method is the way to go. 10× better than a single top coat. This will give you the longest life.
 
OP
I

infiniti007

Member
Joined
Oct 7, 2023
Messages
16
Thanks for the replies so far.

Do you think it’s a cost thing for this contractor? Do they save money by just applying a 4 inch 9.5 coat in one go? Or would it be similar cost for them if I ask for 2 inch base coat, 2 inch 9.5 top coat?
 

jack stand

Well-known member
Joined
Feb 29, 2012
Messages
3,344
Location
Lakes Region Maine
Yeah his costs will be less. The guy doing it the right way will be paving it twice with possibly a day in between for cooling off the base layer that can't be loaded (truck and paver) before it's cool. Like in overnight. 👍
You'll never get the proper compaction on a 4" lift with driveway sized equipment.
 
To avoid these ads, REGISTER NOW!

mm08822

Well-known member
Joined
Jan 13, 2012
Messages
6,004
Location
NJ
The labor is 2x for 2 lifts. The base coat also gives them a chance to address any issues before the top coat is applied.
 

Sumboodie

Well-known member
Joined
Mar 20, 2021
Messages
10,706
Location
AK
Driveways here are 2", 1 coat.

Go figure they are poop.

I'd never do asphalt again. Can't even PARK without sinking and leaving divots, never mind using a floor jack.
 