Saturday, August 1: UGH, August is here. But my electrical should be done in a week or two, so at least I'll have finished that before any second wave in our state.
Finished the emt (repeated on both sides):
This was one of the more complex bends I had to do - it's a saddle with different depths on each side. I ended up downloading an iOS app to help me calculate where to do them.
I'm not happy with the final product - because I err'd on the side of caution and bent it for a 11" obstruction, though the brace was only 7.5" in that direction. I was on the fence about redoing these pieces... but decided against it.
The box at the bottom is strictly to accommodate the extra bends - I debated about running additional circuits in this line but nixed the idea. Once Leviton release their smaller subpanel/load center I'm going to install one on the second floor (erm, I'm assuming this is OK) and run all my electrical for the second floor on it. At that point I might redo this to make it cleaner.
Finished the emt (repeated on both sides):
This was one of the more complex bends I had to do - it's a saddle with different depths on each side. I ended up downloading an iOS app to help me calculate where to do them.
I'm not happy with the final product - because I err'd on the side of caution and bent it for a 11" obstruction, though the brace was only 7.5" in that direction. I was on the fence about redoing these pieces... but decided against it.
The box at the bottom is strictly to accommodate the extra bends - I debated about running additional circuits in this line but nixed the idea. Once Leviton release their smaller subpanel/load center I'm going to install one on the second floor (erm, I'm assuming this is OK) and run all my electrical for the second floor on it. At that point I might redo this to make it cleaner.