Saturday, Mar 19: Spent the day outside, though it was somewhat cold, and I was working with water which didn't help. I had a few tasks today - cut the opening, finish putting in tapcons, trim the 3/4" plywood extensions, double up the side boards around the frame, grind the concrete down a 1/4". I got all of that done:
Test fitting the side boards:
Coat 1 of 2. I treated all the edges and both side up to 16" or so:
Boards removed for preservative treatment, test fit of door:
Sunday I'll flash the bottom area and install the door in the opening.
Test fitting the side boards:
Coat 1 of 2. I treated all the edges and both side up to 16" or so:
Boards removed for preservative treatment, test fit of door:
Sunday I'll flash the bottom area and install the door in the opening.