I FINALLY got time to start my welding table this weekend. First project with my Miller 211... Still have more to do, but at least it is usable.
Was going to build completely from scratch, when a contractor told me about his industrial pallet shelving he wanted to sell, $50/ unit. Had to weld the upright legs to the base, but worked great!
A friend gave me a sheet of 3/8 diamond plate... my son cut it to size , 72" long x 33" deep. Also had him plasma cut the "X" in the left half of the top for clamps. Bought a set of 5"x2" casters (rated 1,000 lb each)from ebay
These pics show the clamps (bought at good 'ol Menards) in the slots...
Still have to mount a vise. (thinking strongly on a receiver to make it removable). Also want to add clamp storage, power strip, removable welding screen on back and both ends, etc.
.........................any other ideas?
.
Was going to build completely from scratch, when a contractor told me about his industrial pallet shelving he wanted to sell, $50/ unit. Had to weld the upright legs to the base, but worked great!
A friend gave me a sheet of 3/8 diamond plate... my son cut it to size , 72" long x 33" deep. Also had him plasma cut the "X" in the left half of the top for clamps. Bought a set of 5"x2" casters (rated 1,000 lb each)from ebay
These pics show the clamps (bought at good 'ol Menards) in the slots...
Still have to mount a vise. (thinking strongly on a receiver to make it removable). Also want to add clamp storage, power strip, removable welding screen on back and both ends, etc.
.........................any other ideas?
.
Last edited: