My shed is ready for delivery and the guy I was talking to quoted $850 for #57 and $450 for crusher/run. He then says the C/R is recycled concrete. Is this OK or go with the 57?
I always thought the C/R was the last bits left after grinding.
I always thought the C/R was the last bits left after grinding.



