The machining on the pulley is finished. Here are the rest of the steps.
To machine the front face I had to flip the part and re-indicate the part to get it true. I had a little movement on the .0005 indicator, perhaps 3 or 4 tenths. That's probably within Fords specification.
Next a facing cut on the front:
and the birds nest that resulted from not clearing the chips away quick enough:
The next step was to drill a pilot hole in the front face, then bore it out to .630 for a very tight fit to the waterpump shaft. I forgot to get photos of the boring.
Then some cosmetic appeal, a 45 degree face on the front
The next step was to take the pulley off the lathe, put it on the water pump which was mounted on the engine and measure how much to cut from the back flange face to get everything to center. I did this in 2 steps, indicating the diameter and outside face each time to make sure the alignment was correct. No photos on this step..
Next, the bolt holes were drilled on the mill:
The the pulley is ready for vibratoy deburr on Monday. Here's what aftermath of cutting down the bar looks like:
And the pulley
After deburring, I hope to have have is sulfuric acid anodized and dyed black. I'll have some photos of that by Wednesday.
Ryan
To machine the front face I had to flip the part and re-indicate the part to get it true. I had a little movement on the .0005 indicator, perhaps 3 or 4 tenths. That's probably within Fords specification.
Next a facing cut on the front:
and the birds nest that resulted from not clearing the chips away quick enough:
The next step was to drill a pilot hole in the front face, then bore it out to .630 for a very tight fit to the waterpump shaft. I forgot to get photos of the boring.
Then some cosmetic appeal, a 45 degree face on the front
The next step was to take the pulley off the lathe, put it on the water pump which was mounted on the engine and measure how much to cut from the back flange face to get everything to center. I did this in 2 steps, indicating the diameter and outside face each time to make sure the alignment was correct. No photos on this step..
Next, the bolt holes were drilled on the mill:
The the pulley is ready for vibratoy deburr on Monday. Here's what aftermath of cutting down the bar looks like:
And the pulley
After deburring, I hope to have have is sulfuric acid anodized and dyed black. I'll have some photos of that by Wednesday.
Ryan
Last edited: