To avoid these ads, REGISTER NOW!

Above 1200 Sq/FT Garage Refurb®

Wokspaces above 1200 squarefeet.
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
I put my shelf up on the pallet rack yesterday. Wasn't feeling the greatest so I didn't do much.KIMG1434.JPG

To hold it in place, I screwed through the top into a couple of 2x3s that I had painted at the same time.KIMG1435.JPG

Then I mounted the single strip LED light underneath. Its supposed to be attached by screws but it didn't want to stay in place. So I cheated and added some zip ties. Now to run the power for the light.KIMG1436.JPG
 
To avoid these ads, REGISTER NOW!

LeonardY

Well-known member
Joined
Apr 16, 2011
Messages
5,036
Location
Southern California
So I mentioned prior to stand by for a future project. That project started yesterday, of course, after a trip to Menards. I had a box of coil stock that I used at my parents but it was too light of a gray. I needed a box of charcoal gray. So now I have a box KIMG1420.JPG

KIMG1421.JPG
I cut a piece 10' long as my brake is 10'6" in length. Then I cut a few strips out of it and tried to bend one up.
Eric,

You did a nice job on that bend. Did you do that with just the hand brake?
 

madison069

Well-known member
Joined
Nov 5, 2010
Messages
4,141
Location
Monroeville, PA
Thanks. She knows about the message on the inside as her fiancee saw it and told her about it.
I'm glad she did get to see it. I do all kinds of stuff like that and my family won't notice any of it. So, i just watch them pass by the easter egg, or see them holding the item and haven't seen the message or note on it yet. Needless to say, I could commit murder in the house and as long as I don't disturb their little world in the house, they wouldn't know......
 

madison069

Well-known member
Joined
Nov 5, 2010
Messages
4,141
Location
Monroeville, PA
I have a Tapco siding brake. I bought it when I sided a friend's house. Do "I" really need a siding brake ? No...But I bought it and now have it.
We always need tools, don't care if you only used it once!

I'm tempted to buy a siding brake myself, but a buddy of mine has one and since he hardly uses his I'm able to borrow it as often as I need it. But It feels better to have my own tools.
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
Aside from being a little sick this week with something in my chest, I've been trying to work on winter heat. Dodging rain and no real good energy level, I have not gotten much done.

Need to finish splitting and stacking what I have here. Possibly make another run to cut more wood.

KIMG1438.JPG
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
And, nobody driving by treats that nice woodpile as a "serve yourself" opportunity?
Only one time did I have some come up missing. I know where it went and pretty sure, they knew that I knew.

Now, it gets a few paint stripes on it so it's easy to see what is missing.
 

rharman

Well-known member
Joined
Apr 22, 2012
Messages
8,758
Location
SoCal
I like the box with the switch. Is the bottom outlet switched or hot all the time? I'd have done hot, myself.

BTW... You need more zip ties on the flex conduit ;)
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
I like the box with the switch. Is the bottom outlet switched or hot all the time? I'd have done hot, myself.

BTW... You need more zip ties on the flex conduit ;)
Both outlets are switched. I left it that way so whatever I'm working on, to use that outlet, I have to turn the power on. I have an additional outlet to the right of the pallet racking. There's also another single outlet on a dedicated 20A circuit underneath the bench. That's for the plasma cutter but I can use it for other things.
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
So progress going down the wall, a piece or two up at a time. I had to move out the welder plug for that last section. Since I have 2 50A outlets, each on their own circuit, I labeled both of them today when I unscrewed this one from the wall.

KIMG1483.JPG

Getting into the corner, had to move a few things like the Argon bottle so I could get back there and work.

KIMG1484.JPG
 
To avoid these ads, REGISTER NOW!
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
All the siding is done on the first wall. Just need to bend up some J-channel for the top. I also have an issue to deal with.... gotta replumb
the regulator for the plasma cutter. KIMG1485.JPG
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
Since November 1st, we took over EMS for the City and half the county, I have pretty much got nothing done in the garage. About the only thing I have gotten done is maintaining a fire in the stove. I did get the mower deck cleaned and as posted elsewhere, put the deck up on the pallet racking for the winter.

mower deck.JPG
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
I finally got some garage time and after seeing an aftermarket tie down for the John Deere, I decided I "needed" to make one. Currently, I have been putting the strap up and over the FEL bucket with it at the front of the trailer.

I have a solid spot on the front of the frame to mount a weld on loop. But it's not getting welded to the JD but on a plate.KIMG1535.JPG
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
I started with a piece of steel out the shorts box. It was the perfect size and I could use the 4 holes already in the frame. The top holes are through holes while the bottom 2 holes are threaded for 1/2"





KIMG1536.JPG

After drilling the holes and making sure they lined up, I marked out the layout for the tie down.


KIMG1537.JPG
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
Then out came the Hobart welder and now it's one piece.
KIMG1538.JPG

A quick clean up and a coat of primer first. While the primer was drying, I cleaned up my mess and tools. Then it got a coat of black paint.
KIMG1539.JPG
Then once that was dry, it got a nice thick coat of Rustoleum bedliner to help protect it from scratches. I let it dry in front of the wood burner. I'll bolt it on tomorrow before I have to come back into work for a 8 hour fill in shift.
KIMG1540.JPG
 

captain14

Well-known member
Joined
Dec 19, 2012
Messages
7,026
Location
Near College Park Maryland 20740
How much was the JD version of the tie down? I know they seem to have proprietary prices for their parts.

How many EMS transport units did the city put in service? And most importantly did they increase staffing for the new units?

Our biggest issues are the wait times at hospitals since they are running short staffed also and can’t monitor enough beds in the ER.

Lastly, are the transport units BLS or ALS staffed?

Funding will aways go into EMS functions.
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
Looks great, Eric!

I noticed the grade 8 bolts. Thanks for sending me down this bolt grade rabbit hole!

:beer:
I've tried to switch over all my hardware selection to either grade 5 or 8. I just use whatever I think is best for the job. What I had on hand in 1/2" was grade 8, so I used it. I'm sure grade 5 would have worked.
 
Last edited:
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
How much was the JD version of the tie down? I know they seem to have proprietary prices for their parts.

How many EMS transport units did the city put in service? And most importantly did they increase staffing for the new units?

Our biggest issues are the wait times at hospitals since they are running short staffed also and can’t monitor enough beds in the ER.

Lastly, are the transport units BLS or ALS staffed?

Funding will always go into EMS functions.
1. This is the link I saw and was going to be my first thought of trying to copy. $50 too rich for my blood.

2. We were running back to the private service. We have a 2010 International med duty as back up to a 2020 Ford F550. We should be taking delivery of a second Ford F550 in the next month or so.

3. Didn't increase staffing per ems rig, we run two per unit. But they did increase department staffing. We are trying to get a couple of more guys hired to have 18+chief. This will give us 6/shift.

4. ED locally is a 9 bed unit plus Trauma A and B. Sometimes they are slow, other times busy. Yesterday, they were slammed with all rooms full. Their biggest problem now is getting people out of the ED. Since the private left town, there is no provider to take certain patients home. We're not doing that, we are handling the emergency/911 calls.

5. ALS staffed. 1st out squad, 2nd out squad both ALS. Depending who is working right now, the Engine is third out or back up. It may or may not be a Medic Engine. If we get slammed, we are partnered up one of the volunteer departments to bring their squad in, however, it's not much more than a transport unit. The volunteer has a few Medics, a few Basics and the rest are pretty much EMR.

6. Funding, always been a talking point or argument here. City Administration has always felt that Tree City USA, parks/dog parks, bike paths and an Arch over main street are priorities or city services. But enough of that talk.
 
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,884
Location
Northern Central Ohio
Started a new little project in the garage. We bought a new printer for the home PC. In the picture below, is a box I made years ago for the tower to sit on to keep it off the floor, which was carpet then. Having a dog in the house, the dog hair gets everywhere. To combat that I made this box to raise it up off the floor and it did seem to help.

Now buying this new printer and using my inherited grandmother's library desk (probably 100 years old) it doesn't leave much room for a printer. The old printer sat below but was always in the way and the granddaughter managed to kick it once and break the paper feed tray.

So I have come up with a plan in my mind, starting with the box.


KIMG1544.JPG


I ripped some poplar boards down to make some sides. I used the Kreg jig to do a few of the holes.
KIMG1545.JPG


Here are the sides, glued and screwed together. They are mocked up for now and will still need to get some finish work before I go much farther. Next up is making a top or shelf for the printer to sit on.
KIMG1546.JPG
 
Last edited:
To avoid these ads, REGISTER NOW!
Top Bottom