Got the opposite side of the building done this weekend, 4 coats. Once again, my associate did a great job of laying it down. His technique seems to be a heavy wet roller, about two 10’ strips then load the roller again. Not much effort spent back rolling. For those of you getting ready to use Hellfire, don’t panic when you put the first coat down, it will look pretty ugly due to the concrete sucking it up. We waited 2 hours between coats and it was plenty dry to walk on, we wore those cheap disposable slip on clean room shoe covers changing them each time we crossed onto the fresh floor. Another tip, if you have spider cracks and imperfections, daub Hellfire into them in advance of rolling that section.
Tip of the hat to Legacy, they were spot on as to the amount of product require to do the job.